IDOT Gives Motorists a Break for Thanksgiving Holiday Weekend

Due to the nature of some projects, there will be construction zones throughout the state that will continue to have lane closures in effect.  IDOT is urging motorists to slow down and drive with caution through these work zones.  Holiday travelers are reminded that work speed zone limits are still in effect.

According to AAA Chicago, more than 33.2 million Americans (81 percent of all holiday travelers) expect to travel by automobile, a 1.2 percent decrease from the 33.6 million people who drove a year ago.  In Illinois, more than 1.5 million people, or 4.2 percent of the population will be traveling for the holiday weekend.  Of those 1.16 million will be driving.

Motorists are advised to check www.gettingaroundillinois.com for road condition reports and updates on road construction.  Interstate road condition information is also available by phone at

1-800-452-IDOT (4368).

Areas that will continue to have lane closures are as follows:

District 1 

            COOK COUNTY

            Municipality

·         Blue Island 1- 27th & Maple.  Intersection widening – one lane in each direction

·         Harvey – 159th St. from Lexington to Fisk – Reconstruction – No impacts on 159th.  Park Ave NB will be one lane (lane 2 closed).  Work will proceed up on the RR tracks

·         Niles – Cumberland Avenue from Oakton Street to Church Street – Reconstruction   – Lane restrictions

·         Chicago – Eastbound 115th Street over I-94 (Bishop Ford Expressway) – Bridge work Eastbound 115th Street closed at I-94.  Use 111th Street entrance ramp to access I-94 West Bound

·         Skokie & Evanston – Emerson St. over the North Shore Channel – Bridge Work – Road closed.  Detour posted.

·         Wilmette – Green Bay Road at Wilmette Ave., Central Ace, & Lake Ave –Reconstruction – Lane restrictions

·         Posen – I-57 at 147th Street (Sibley Blvd) – Bridge Repair – Two 11 ft lanes open in each direction, shoulders closed

·         Lemont – IL 171 & 131st – Intersection Widening – Lane shifts, narrow lanes

·         Glenview – IL 21 from Willow Rd. to Sanders – Recontruction & Bridge Work – One lane open in each direction.

·         Orland Park, Palos Heights, and Worth – IL 43 (Harlem Ave) from 159th (US 6) to SW Hwy (IL 7) – Resurfacing Culvert Repair – One lane in each direction on Harlem @ Tinley Creek (just north of 143rd St.)

·         Evanston – Ridge Ave. from Clark St. to Howard St. – Resurfacing – One lane is open in each direction

·         Wilmette – Sheridan Rd. from 10th St. to Isabella St. – Reconstruction – SB lanes are closed.  Traffic was moved to the NB lanes.  One lane is open in each direction

·         Willow Springs – Willow Springs Rd. over the Des Plaines River – Bridge Work – One lane closed in each direction

Page 3

            KANE COUNTY

·         Sugar Grove – Hankes Road over IL Route 56 – Bridge Work – Hankes road reduce to one lane with directional traffic signal

·         Batavia – IL 31 over Mill Creek – Bridge Work – One lane in each direction

·         Elgin – U.S. 20 (Lake St.) over the Elgin, Joliet & Eastern Railway Co. – Bridge Work & Resurfacing – One lane open in each direction

            LAKE

·         Lake Forest – IL 60 over the Tri-State Tollway & from Riverwoods Rd. Blvd. to Saunders Rd. /Field Dr. – Bridge Work, Reconstruction & Resurfacing – Two lanes EB & two lanes WB with left turn lanes provided at signalized intersections

·         Lake Forest, Highland Park – Old Elm Rd. over the Skokie River            -Bridge Reconstruction – Bridge is closed. Detour posted

·         Waukegan – Sheridan Rd. from Belvidere Rd. to Grand Ave – Reconstruction – One lane in each direction

·         Waukegan, Gurnee – Sunset Ave. from Delany Rd. to IL 131 – Reconstruction – One lane in each direction

            MCHENRY COUNTY

·          Chemung – IL 173 3 mi. w/o US 14 (over Piscasaw Creek)

Bridge – Reconstruction. Traffic is limited to one lane only with the use of temp signals

·         Marengo – IL 176 between Millstream Rd. and North Union Rd. – Bridge Reconstruction One lane at bridge over Kishwaukee River with temporary signals. Detour route for bridge over the South branch of the Kishwaukee River

            WILL COUNTY

·         Elwood – IL 53 over Prairie Creek – Bridge Work – SB traffic shifts to NB 53.  One lane in each direction

·         Plainfield – IL 59 over DuPage River – Bridge Work – Narrow lanes with NO shoulders

·         Braidwood – IL Route 113 (Main St.) at IL Route 129 (Washington St.) IL Route 53 (Front St.) and the Union Pacific Railroad crossing.           Reconstruction – One lane in each direction.

·         Wilmington – S. Arsenal Rd       Reconstruction – Closed from Indian Trail Rd. to Local 150 entrance.  Detour posted.

Page 4

·         Frankfort – US 45 from Laraway Rd. to Steger Rd. – Bridge Work – One lane in each direction across the bridge.  Temporary traffic signals in place.

·         Frankfort – US 45 over Prairie Creek – Bridge Reconstruction – One lane in each direction with temporary signals.

·         Manhattan – US 52 over Prairie Creek – Bridge Work – Single lane with temporary traffic signals.

 

District 2

CARROLL COUNTY

·         US 52 east of Lanark near the Ogle County line. Culvert replacements at three separate locations restricts traffic to one lane controlled by temporary traffic signals.

·         US 52 over the Mississippi River between Savanna, IL and Sabula, Iowa. Bridge rehabilitation restricts traffic to one lane controlled by temporary traffic signals.

·         US 52 one mile west of Milledgeville. Reconstruction of the Otter Creek bridge restricts traffic to one lane controlled by temporary traffic signals.

·         IL 78 north of Mt Carroll to the JoDaviess County line. The contractor is replacing five separate box culverts. Traffic is restricted to one lane at the final two locations as the structures are being replaced one half at a time and controlled by temporary traffic signals.

HENRY COUNTY

·         IL 78 at the Green River five miles north of Annawan. Traffic is restricted to one lane with temporary traffic signals as the bridge deck is replaced one half at a time.

ROCK ISLAND COUNTY

·         I-80 bridge over I-88 northeast of Silvis. Bridge deck replacement restricts traffic to one lane in each direction on I-80.

·         IL 92 bridges on the Centennial Expressway over 7th Avenue, 18th Avenue, and 31st Avenue are all restricted to one lane in east direction as the bridges are replaced one half at a time.

WINNEBAGO COUNTY

·         IL 251 (Kishwaukee Street) in Rockford from Harrison Avenue to 15th Street. Removal and replacement of the roadway pavement has restricted traffic to one lane in each direction.

Page 5

District 3

            GRUNDY COUNTY

·         Illinois 53, 1 mile north of Gardner, Bridge Repairs, One lane open, controlled by signals.

            IROQUOIS COUNTY

·         Illinois 49, just south of Cissna Park, Bridge Replacement, One lane open, controlled by signals.

·         Illinois 116, 4 miles west of Ashkum, Bridge Repairs, One lane open, controlled by signals.

            LIVINGSTON COUNTY

·         Illinois 47, 5 miles south of Illinois 116, Bridge Replacement, One lane open, controlled by signals.

District 5

            VERMILION COUNTY

·         Illinois 49 over Interstate 74, bridge replacement at Illinois 49(N) Northwest of Fithian.  A marked route detour is in effect.

District 6

            MONTGOMERY COUNTY

 

·         IL 127 one mile north of Donnelson, Staged Construction Bridge, One lane open controlled by signals.

 

District 7

 

            LAWRENCE COUNTY

 

  • Near Lawrenceville on US Rt. 50 – bridge construction w/1 lane traffic and signals

      WAYNE COUNTY

 Near Cisne on US Rt. 45 – 3 locations of bridge construction w/1 lane traffic and signals

MACON COUNTY

 

  • In Decatur on IL Rt. 48 – bridge construction with shoulder restrictions

 

Additional Projects (State Routes) in District 7

 

  • I-70 in Clark Co., warranty repairs
  • Approach pavement on IL 15 for the Mt. Carmel bridge
  • Old IL 140 from Vandalia to Mulberry Grove
  • IL 48, just south of IL 121, in Decatur
  • IL 16 in Shelbyville
  • IL 33, Effingham to Beecher City
  • IL 33, Effingham to Dieterich
  • IL 15 Mt. Carmel bridge
  • IL 1, Mt. Carmel to Lawrence C.L.

District 8

            ST. CLAIR COUNTY

·         A lane shift and restriction will be encountered along Illinois Route 13/15 just east of Green Mount Road.  The project is scheduled to be completed by the Summer or 2009.

            CLINTON COUNTY

·         Old U.S. Route 50 will be closed to traffic for bridge replacement approximately 1 mile west of Aviston.  Motorists should follow the marked detour utilizing Illinois Route 160, New U.S. Route 50, and Russland Street.  The project is expected to be completed by the end of 2008.

·         US 45 north & south of Cisne (3 structures w/ signals & temporary concrete barrier); restricted to one lane

·         I-70 (EB & WB P.L. shoulder closures w/ temporary concrete barrier at approx. mp 98.5

·         US 50 near Lawrenceville, just west of IL 1 (1 structure w/ signals & temporary concrete barrier); restricted to one lane

District 9

            JEFFERSON COUNTY

·         42nd Street, east of new Veteran’s drive Interchange, Intersection closed due to construction

            FRANKLIN COUNTY

·         Illinois 34, 3.2 miles east of Benton, One lane temporary bridge with traffic controlled by temporary signals

HAMILTON COUNTY

·         Illinois 142, Just north of Broughton (2 bridges), One lane bridge construction with traffic controlled by temporary signals

            HARDIN

·         Illinois 1, 2 miles south of Gallatin County, One lane bridge construction with traffic controlled by temporary signals

·         Illinois 1, 4 miles south of Gallatin County, One lane bridge construction with traffic controlled by temporary signals

            WILLIAMSON

·         Illinois 37, 4 miles south of Marion, One lane temporary bridge with traffic controlled by temporary signals

·         Illinois 37, just north of Johnson Co. line, One lane bridge construction with traffic controlled by temporary signals

·         I-57, Old 13, Milepost 53 on Interstate 57, One lane closed in each direction for median access

·         I-57/Old 13, Milepost 53 on Interstate 57, Entrance ramps onto I-57 From Main Street closed for construction

            JOHNSON COUNTY

·         Illinois 146, 1 mile west of Illinois 37, One lane bridge construction with traffic controlled by temporary signals

            SALINE COUNTY

·         Illinois 34, North city limit of Harrisburg, One lane bridge construction with traffic controlled by temporary signals

            UNION

·         U.S. 51, 2 miles north of Anna, One lane bridge construction with traffic signals